Electrical BOQ software: prepare a clearer bill of quantities

An electrical bill of quantities (BOQ) turns drawings, specifications and measured work into an itemized schedule that can be priced, reviewed and compared. PRIWAD ESTIMA provides a demonstration workspace for organizing BOQ lines and connecting them to material take-off and quotation preparation.

Core fields in an electrical BOQ

Each line should use a unique item code where practical, a specific description, a unit of measurement, a measured base quantity, a wastage assumption where justified, a rate, a rate source and an amount. Keep labour included in a composite rate or separated as a distinct cost line consistently; avoid double counting.

Lighting and small power

Describe luminaire types, switches, socket outlets, point wiring and installation conditions rather than relying on vague labels.

Cables and containment

Record conductor size, cable type, installation method, route lengths and conduit or trunking sizes. Verify design selections independently.

Distribution and protection

Identify boards, breakers, RCD/RCCB devices, accessories, earthing and testing requirements against project specifications.

From measured quantity to priced BOQ

  1. Use drawings and site measurements to determine the base quantity.
  2. Check the unit and scope for each line.
  3. Apply material wastage only where relevant.
  4. Use current supplier prices and document the quote date, brand and specification.
  5. Calculate line amounts and reconcile subtotals to the estimate.
  6. Review exclusions, provisional items and items requiring specialist design.

BOQ quality checks

Check for duplicated lines, missing accessories, incompatible units, omitted testing, unrealistic quantities and mismatches between the BOQ and the scope. Confirm whether rates include delivery, installation, tools, commissioning, taxes or other costs. For larger projects, retain a clear revision history so changes can be traced.

After quantities are reviewed, use the material take-off workflow to plan procurement and the quotation workflow to communicate the commercial offer.

Important: Example rates and calculations are for planning and demonstration only. Confirm quantities, technical specifications, current supplier quotations, labour, taxes and applicable Kenyan requirements before procurement or issuing a binding quotation.