1. Confirm the documents and scope
Gather the latest drawings, specifications, schedules, addenda and site information. Check revision dates and identify missing information before measuring. List assumptions and request clarification where a design detail changes quantities or cost.
2. Divide the installation into work sections
Use a structure that matches the project: lighting, small power, cables, containment, distribution boards, protection, earthing and bonding, specialist systems, testing and commissioning. Add solar or CCTV sections only where included in the scope.
3. Measure and describe each item
Give each line a clear description and unit. State cable size and type, containment dimensions, fitting specification and installation method where relevant. Measure from drawings and verify route lengths, mounting conditions and site constraints when possible. Do not rely on a generic “complete installation” line for complex work without an adequate breakdown.
4. Apply rates consistently
Record the supplier, quote date, brand, specification, delivery assumptions and whether a rate includes taxes. Decide whether labour is included in each composite rate or shown separately. Keep allowances for overhead and profit distinct so the final selling price can be checked.
5. Review the BOQ before pricing
- Check duplicated or missing lines.
- Confirm units and conversion factors.
- Review accessories, terminations, supports and testing.
- Separate provisional items from measured quantities.
- Reconcile subtotals and document exclusions.
6. Link it to procurement and quotation
After review, prepare a material take-off and compare procurement quantities against pack sizes and supplier availability. Then transfer the priced schedule into a professional quotation. PRIWAD ESTIMA can help structure this process, but its demonstration rates require verification.